Mater - cyfarfodydd
FUL/000633/23
Cyfarfod: 10/01/2024 - Pwyllgor Cynllunio (eitem 48)
As in report
Dogfennau ychwanegol:
- Enc. 1 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, eitem 48 PDF 2 MB
- Enc. 2 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, eitem 48 PDF 2 MB
- Enc. 3 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell, eitem 48 PDF 2 MB
- Gweddarllediad ar gyfer FUL/000633/23 - C - Cais llawn - Adeiladu a gweithredu'r tair Gorsaf Falf wedi'u Blocio sy'n gysylltiedig â chynnig Biblinell Carbon Deuocsid HyNet ar dir ger Cornist Lane, y Fflint; Pentre Helygain, a thir ger Racecourse Lane, Babell
Cofnodion:
Rhoi caniatâd cynllunio yn ddibynnol ar yr amodau a restrir yn yr adroddiad yn unol ag argymhelliad y swyddog.