Manylion y penderfyniad
FUL/000633/23 - A - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell
Statws y Penderfyniad: Recommendations Approved
Is AllweddolPenderfyniad?: Nac ydw
Yn amodol ar gael ei alw i mewn?: Nac ydw
Penderfyniadau:
Rhoi caniatâd cynllunio yn ddibynnol ar yr amodau a restrir yn yr adroddiad yn unol ag argymhelliad y swyddog.
Awdur yr adroddiad: Charlie Pope
Dyddiad cyhoeddi: 05/04/2024
Dyddiad y penderfyniad: 10/01/2024
Penderfynwyd yn y cyfarfod: 10/01/2024 - Pwyllgor Cynllunio
Dogfennau Atodol:
- FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell PDF 211 KB
- Enc. 1 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell PDF 2 MB
- Enc. 2 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell PDF 2 MB
- Enc. 3 for FUL/000633/23 - Full application - Construction and operation of the three Block Valve Stations (BVS) in connection with the with HyNet Carbon Dioxide Pipeline proposal at Land adjacent to Cornist Lane, Flint, Pentre Halkyn & Babell PDF 2 MB